{"id":62,"date":"2026-03-14T21:27:38","date_gmt":"2026-03-14T21:27:38","guid":{"rendered":"https:\/\/liaaco.com\/elevator\/?page_id=62"},"modified":"2026-03-15T02:14:49","modified_gmt":"2026-03-15T02:14:49","slug":"pre-shipment-insp","status":"publish","type":"page","link":"https:\/\/liaaco.com\/elevator\/pre-shipment-insp\/","title":{"rendered":"Pre-Shipment Inspection"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"62\" class=\"elementor elementor-62\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2fa8378 e-flex e-con-boxed e-con e-parent\" data-id=\"2fa8378\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-b27b1fa e-con-full e-flex e-con e-child\" data-id=\"b27b1fa\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-3d28348 e-con-full e-flex e-con e-child\" data-id=\"3d28348\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6730b75 elementor-widget elementor-widget-button\" data-id=\"6730b75\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Pre-Shipment Inspection (PSI) by Lloyds Inspection Agency America LLC<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-03fa54b elementor-widget elementor-widget-text-editor\" data-id=\"03fa54b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>Pre-Shipment Inspection (PSI) is carried out by LLOYDS at the manufacturer\u2019s facility or warehouse before the elevator, escalator, or travellator equipment is dispatched to the project site. During this inspection, LLOYDS inspectors verify that the equipment and components correspond with the approved specifications, purchase order, and packing documentation. The inspection typically includes verification of equipment quantity, model and serial numbers, component identification, packaging condition, marking and labeling, and overall readiness of the goods for shipment. LLOYDS may also review relevant technical documents and confirm that the shipment matches the approved project requirements.<\/p><p>The benefits of Pre-Shipment Inspection include independent verification that the supplied equipment is correct, complete, and properly packed before shipment. PSI helps prevent incorrect shipments, missing components, or damaged equipment from reaching the project site, thereby reducing installation delays and additional costs. After completion of the inspection, LLOYDS submits documentation to the client which may include a <strong>Pre-Shipment Inspection Report, Inspection Release Note or Shipment Approval, packing verification records, equipment identification and quantity verification sheet, photo inspection records, and a document review summary<\/strong> confirming that the inspected goods comply with project specifications and are ready for shipment.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-1024750 e-con-full e-flex e-con e-child\" data-id=\"1024750\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8898588 e-flex e-con-boxed e-con e-parent\" data-id=\"8898588\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-3110f20 e-con-full e-flex e-con e-child\" data-id=\"3110f20\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-5529855 e-con-full e-flex e-con e-child\" data-id=\"5529855\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6dad608 elementor-widget elementor-widget-button\" data-id=\"6dad608\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Benefits of Pre-Shipment Inspection (PSI) by Lloyds Inspection Agency America LLC<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e1a4a96 elementor-widget elementor-widget-text-editor\" data-id=\"e1a4a96\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>Pre-Shipment Inspection provides several important benefits to clients, contractors, and project authorities by ensuring that equipment is properly verified before shipment.<\/p><ol><li><strong>Verification of Correct Equipment<\/strong><br \/>Confirms that the elevator, escalator, or travellator equipment supplied matches the approved specifications, purchase order, and project requirements.<\/li><li><strong>Prevention of Shipment Errors<\/strong><br \/>Identifies missing components, incorrect items, or quantity discrepancies before the goods are dispatched.<\/li><li><strong>Quality Assurance<\/strong><br \/>Ensures that equipment and components meet required quality standards and manufacturing specifications.<\/li><li><strong>Packaging and Handling Verification<\/strong><br \/>Confirms that the equipment is properly packed, labeled, and protected for safe transportation.<\/li><li><strong>Reduction of Installation Delays<\/strong><br \/>Detects issues before shipment, preventing costly delays and corrective work at the installation site.<\/li><li><strong>Support for Customs and Import Clearance<\/strong><br \/>Inspection documentation helps customs authorities and project owners verify shipment contents.<\/li><li><strong>Independent Third-Party Verification<\/strong><br \/>Provides unbiased inspection and confirmation from an independent technical authority.<\/li><li><strong>Improved Project Confidence<\/strong><br \/>Gives clients confidence that the equipment being delivered has been inspected and verified before shipment.<\/li><li><strong>Risk Reduction<\/strong><br \/>Minimizes risks related to equipment damage, incomplete deliveries, or non-compliant products.<\/li><li><strong>Project Documentation Support<\/strong><br \/>Provides official inspection records that support project documentation and compliance verification.<\/li><\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-c2f3c26 e-con-full e-flex e-con e-child\" data-id=\"c2f3c26\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-ea70f12 e-flex e-con-boxed e-con e-parent\" data-id=\"ea70f12\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t<div class=\"elementor-element elementor-element-174c757 e-con-full e-flex e-con e-child\" data-id=\"174c757\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-ac60b70 e-con-full e-flex e-con e-child\" data-id=\"ac60b70\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7eddffd elementor-widget elementor-widget-button\" data-id=\"7eddffd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Type of Documents Submitted to Client After Pre-Shipment Inspection (PSI)<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-430b692 elementor-widget elementor-widget-text-editor\" data-id=\"430b692\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>After completion of the <strong>Pre-Shipment Inspection (PSI)<\/strong> conducted by <strong>Lloyds Inspection Agency America LLC<\/strong>, the following documents are typically submitted to the client for verification, shipment approval, and project documentation purposes:<\/p><ol><li><strong>Pre-Shipment Inspection (PSI) Report<\/strong><br \/>A detailed inspection report describing the inspection scope, equipment details, quantities verified, inspection findings, packaging condition, and compliance with project specifications.<\/li><li><strong>Inspection Release Note \/ Shipment Approval Certificate<\/strong><br \/>A formal document confirming that the inspected equipment has been reviewed and is <strong>approved for shipment<\/strong>, subject to project requirements.<\/li><li><strong>Packing List Verification Report<\/strong><br \/>Verification of the packing list confirming that the quantity, description, package numbers, weights, and dimensions match the actual equipment prepared for shipment.<\/li><li><strong>Equipment Identification Verification Sheet<\/strong><br \/>A document verifying equipment identification details such as <strong>model numbers, serial numbers, manufacturer details, and component markings<\/strong>.<\/li><li><strong>Photographic Inspection Record<\/strong><br \/>Photographs taken during inspection showing equipment condition, packaging, labeling, container preparation, and identification markings.<\/li><li><strong>Container Loading Verification Report (if applicable)<\/strong><br \/>Documentation confirming the container number, container condition, seal number, cargo arrangement, and loading supervision.<\/li><li><strong>Document Review Summary<\/strong><br \/>A summary of the technical and commercial documents reviewed during the inspection, such as <strong>commercial invoice, packing list, equipment specifications, and certification documents<\/strong>.<\/li><li><strong>Non-Conformance Report (NCR) \u2013 if applicable<\/strong><br \/>A report identifying any deviations or non-conformities found during inspection that may require corrective action.<\/li><li><strong>Inspection Attendance Record \/ Witness Statement<\/strong><br \/>A record confirming that the inspection was carried out by LLOYDS inspectors at the manufacturer\u2019s facility or warehouse.<\/li><li><strong>Final Inspection Status Statement<\/strong><br \/>A concluding statement indicating whether the equipment is <strong>Accepted, Conditionally Accepted, or Rejected<\/strong> based on the inspection results.<\/li><\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-3b9cf4f e-con-full e-flex e-con e-child\" data-id=\"3b9cf4f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Pre-Shipment Inspection (PSI) by Lloyds Inspection Agency America LLC Pre-Shipment Inspection (PSI) is carried out by LLOYDS at the manufacturer\u2019s facility or warehouse before the elevator, escalator, or travellator equipment is dispatched to the project site. During this inspection, LLOYDS inspectors verify that the equipment and components correspond with the approved specifications, purchase order, and&hellip;&nbsp;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-templates\/template-pagebuilder-full-width.php","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","footnotes":""},"class_list":["post-62","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/liaaco.com\/elevator\/wp-json\/wp\/v2\/pages\/62","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/liaaco.com\/elevator\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/liaaco.com\/elevator\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/liaaco.com\/elevator\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/liaaco.com\/elevator\/wp-json\/wp\/v2\/comments?post=62"}],"version-history":[{"count":5,"href":"https:\/\/liaaco.com\/elevator\/wp-json\/wp\/v2\/pages\/62\/revisions"}],"predecessor-version":[{"id":196,"href":"https:\/\/liaaco.com\/elevator\/wp-json\/wp\/v2\/pages\/62\/revisions\/196"}],"wp:attachment":[{"href":"https:\/\/liaaco.com\/elevator\/wp-json\/wp\/v2\/media?parent=62"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}